Alta_redneck Alta_redneck:
ziggy ziggy:
live and learn,no power lines where I was the last year and a half.
DBC is looking for an experienced hoe operator here, with exceptional skills around everything that can be buried in the ground, fiber optics everything. And everything is main lines between Cal and Ed. Sounds like it's just calling for you Zig. There’s about a km of that.

I dont like digging hotlines,too many chances for screw-ups if everything isnt located and lot's of times it isnt,especially fibre optics and I wouldnt want to hit one of those.Plus the shite flows downhill.
I've been having fun trying to get this 16 kliks of ten inch set up for the mainline crew next week.

Just me,the spread,a labourer,hoe hand and fuser here right now.We have all the drags fused,3/4 of the directional done,pipe set out,a section stripped and 5 kliks ready for mainline to start digging.
This will be sweet as the ROW runs right adjacent to the old railway right of way that used to run through Coronation.Lots of railroad spikes,got a flat third pass stripping the first 100 meters last week so we will use the hoe's.
The spread here is an excellent guy and friend and his #1 concern after getting the pipe in the ground is haveing fun.
I also found out why so many of the gals in town are blonde after I saw the sign for the Norwegian trail.
So I'm having fun and have plans for later in the summer for another job which I will enjoy and hopefully will be doing for a long time.
Thanks though for the tip,I do know a few excellent hoe operators that might be interested though and I'll see them this weekend when I get home.